Approval only because of tubing change

Operator waited a long time for approval before changing the tubing size.

wellbore schematic With new scrutiny by the AER on maximum well head injection pressure, enhanced recovery schemes are harder to get approved. But this one was approved after a long waiting period when the operator promised to change the tubing size in his injector.

Regulation changes can keep you guessing about how to get applications approved. Proven has submitted over a thousand applications. We know how to get the quickest approval. Can we help?

Subscribers can view this application by pasting the following link into their browser after logging into AppIntel. app.appintel.info/AOW.php?pxnrg=5x787o3239343o313832346262

Tags: Flood

Granger Low  25 May 2015



Flood repatterning

Extended life support

Repairing microannulus in thermal wells

Check out the 4D seismic chamber thickness map

In-house AI attempts fail-80%

Spin off your in-house AI attempt

Facility fugitive emissions scrutiny

Keep your eye on the horizon of oil and gas change

AppIntel AI hit alerts

Ignite your insight

Blowdown and NCG injection

SIRs often reveal more than submissions

AppIntel AI contains much more than technical papers

More current. More coverage. More detail. More trusted.

New flood to double reserves for heavy oil pool

The age of water floods is not over

This page last updated 06 February 2026.
Copyright 2011-2026 by Regaware Systems Ltd.
  Calgary, Alberta, Canada
AppIntel is an AI service for getting intelligence from industry submissions vetted by government. Nothing on this page may be construed as engineering or geoscience advice. If you spot any errors on this site, please email our webmaster.
  Share